What is the official connection from Mangwon Station to Mangwon Hangang Park?
Short answer
Partly · Official sourceThe park authority lists Mangwon Station Exit 1, then Mapo09 or Mapo16 to the park stop. A market-to-park walking route is unverified.
- Confirmed
- Posted station-to-park connection — Works
- What to do
Distinguish the park destination from the market; use the park authority’s Mangwon Station Exit 1 connection when planning from the station.
- Not confirmed
- Market-to-park journey
Last verified
On this page
What does the evidence cover?
The posted station-to-park connection is Line 6 Mangwon Station Exit 1, then Mapo09 or Mapo16 to the Mangwon Hangang Park stop. Check current operation separately.
- [S122] Official source (KO) · Observed: Not confirmed · Checked:
| Action or condition | Verdict | Evidence |
|---|---|---|
| Posted station-to-park connection The park authority lists Mangwon Station, Line 6, Exit 1, Mapo09 or Mapo16, and the Mangwon Hangang Park stop. | Works · Official source |
|
| Market-to-park journey Direct walking from the market, crossings, journey time, live departures, last buses and step-free access have not been verified. | Not confirmed | Not confirmed |
What should I check next?
Distinguish the park destination from the market; use the park authority’s Mangwon Station Exit 1 connection when planning from the station.
- [S122] Official source (KO) · Observed: Not confirmed · Checked:
Check the current route and operating notices for Mapo09 or Mapo16 and the Mangwon Hangang Park stop before setting off.
- [S122] Official source (KO) · Observed: Not confirmed · Checked:
What are the limits and unknowns?
- This answers the official station-to-park connection only. It does not verify a continuous market-to-park itinerary.
- No bus journey, map search or accessible route was tested.
Sources
Official source: Confirmed in an official document or on an official site. Observed is the date the source itself gives for the notice, event or test (Reported, for a report by travellers). Checked is the date we read it. “Not confirmed” after Observed means the source gives no date, and we don’t guess one.
-
[S122]Official source (KO) hangang.seoul.go.kr Observed: Not confirmed · Checked:Details
The park authority lists Mangwon Station, Line 6, Exit 1, then Mapo09 or Mapo16 to the Mangwon Hangang Park stop. Live operation, last buses and the market-to-park walking connection were not verified.
Read in the supplied R4C research at 2026-10-19 (Asia/Seoul): docs/design/round3/research/area-intents-c.md; research/raw/r4c-sources.json, C-M03. This implementation made no network request. Publication dates are not field observations.
D3: Responsible operator or agency guidance within the stated facility scope; no visit, booking, storage or transaction was tested.
Dates and changes
Last verified
Content updated: