Seongsu · Local

When does Yeonmujang-gil's weekend pedestrian-safety programme operate?

Short answer

Partly · Official source

The district posts a 2026 weekend programme window. Its full street coverage and operation on your date are not confirmed.

Confirmed
  • Posted 2026 programme — Works
  • Programme exceptions — Works
What to do

Compare your visit date with the posted 2026 period, weekend days and 14:00–18:00 window.

Not confirmed
  • Full section and your date

Last verified

On this page

What does the evidence cover?

The posted window is Saturdays and Sundays, 14:00–18:00, March 28–November 29, 2026, with weather and stated holiday exclusions. It is not an all-year car-free-street guarantee.

  • [S174] Official source (KO) · Observed: Not confirmed · Checked:
What the evidence covers
Action or conditionVerdictEvidence
Posted 2026 programme

The notice posts Saturdays and Sundays, 14:00–18:00, from March 28 to November 29, 2026.

Works · Official source
  • [S174] Official source (KO) · Observed: Not confirmed · Checked:
Programme exceptions

The notice excludes adverse weather, alerts and its stated Chuseok holiday period.

Works · Official source
  • [S174] Official source (KO) · Observed: Not confirmed · Checked:
Full section and your date

The complete controlled section and operation on your visit date have not been verified.

Not confirmed Not confirmed

What should I check next?

  1. Compare your visit date with the posted 2026 period, weekend days and 14:00–18:00 window.

    • [S174] Official source (KO) · Observed: Not confirmed · Checked:
  2. Check the notice for exclusions and the applicable section before relying on the programme. On-site control signs still need checking.

    • [S174] Official source (KO) · Observed: Not confirmed · Checked:

What are the limits and unknowns?

  • The first public web body was readable, but later retrievals failed; recheck before visiting.
  • The programme window is not a café, shop or pop-up opening time. No on-site visit was made.

Sources

Official source: Confirmed in an official document or on an official site. Observed is the date the source itself gives for the notice, event or test (Reported, for a report by travellers). Checked is the date we read it. “Not confirmed” after Observed means the source gives no date, and we don’t guess one.

  • [S174] Official source (KO) sd.go.kr Observed: Not confirmed · Checked:

    Read source [S174]

    Details

    The posted 2026 weekend programme runs March 28–November 29, 14:00–18:00, with weather and stated holiday exclusions. It does not establish an all-year pedestrian zone.

    Read in the supplied R4A research at 2026-10-19T18:12:28+09:00 (Asia/Seoul): docs/design/round3/research/area-intents.md, R4A-S06; research/raw/r4a-s06.json. This implementation made no network request. observed_at is not confirmed; the publication date is not a field observation. The initial public web body was readable; later GET and web attempts failed. The evidence date uses the successful initial read, not the failed later attempt.

    D3: The responsible operator or agency documents only the stated scope; no visit or transaction was tested.

Dates and changes

Last verified

Content updated: